Home / Shower Floor Replacement

Floor Replacement, Start to Finish

Old floor out at the wall line. New floor sloped to drain.

This page walks the full replacement sequence we run on every Southington floor: how we protect your walls and glass, what the substrate inspection covers, the waterproofing assembly, tile and grout choices that survive bare feet and shampoo, and the flood-and-flow tests before handoff. If your pan liner is sound, we keep it and prove it; if it's not, the pan page explains the rebuild.

  • Surgical removal. Floor out to a clean wall line; sound walls and glass preserved.
  • Substrate rebuilt. Sloped bed verified or re-poured — ponding is never 'normal.'
  • Waterproofed assembly. Membrane lapped up walls and clamped at the drain.
  • Full-coverage setting. No spot-bonding, no hollow tiles — ever.
  • Epoxy grout standard. Stain-proof joints that stay clean under daily use.
  • Tested handoff. Flow test to drain + walkthrough before final payment.

Southington notes

Hall baths carry the load in Southington family homes: original tub walls with soap-scum grout, floors with cracked tiles at the doorway. Primary-bath shower floors from the 90s boom are delaminating on schedule now. Most Southington replacements run day-one rebuild, day-two tile and grout: Southington's 90s primary showers are failing in waves — loose floor tile and musty grout that no cleaner fixes. Re-tile the floor, save the walls. Shower again 24 hours after grout — timed to the hour at walkthrough.

Materials

The Southington floor rebuild

Six Southington shower floors, from workhorse mosaic to spa pebble.

Porcelain 2x2 — Slope-perfect standard.
Unglazed quarry
River pebble
Mini brick-joint
FAQ

Common questions

What slope does a shower floor need?

Minimum 1/4 inch per foot to the drain — verified with water before tile, not eyeballed. Ponding anywhere means re-do, on us.

Why epoxy grout on floors?

Shampoo, body oils and hard water destroy cement grout on floors within years. Epoxy is stain-proof and waterproof — roughly $100–$200 more per floor, worth every cent.

Do you replace the drain too?

We inspect every drain; clamping drains get cleaned and re-sealed, tired drains get replaced ($200–$600) while the floor is open — never tiled around and hoped about.

Why two days for ten square feet?

Cure times rule: base, membrane, setting and grout each need their hours. Rush them and you buy the next leak. Day one rebuild, day two finish.